We received a commission from a client to repair an industrial concrete mixer at a permanently installed concrete plant. The work presented a challenge because no plans or documentation were available. Therefore, we had to take measurements of the worn parts and calculate back to determine the original dimensions. A further challenge was fitting the repair work into the breaks of the concrete plant’s two-shift work schedule.